A producing U.S. nickel platform built to deliver cash flow and growth

Talon Metals acquired the Eagle Mine and Humboldt Mill in Michigan’s Upper Peninsula in January 2026, which is one of the only operating sources of domestically produced nickel, copper, cobalt, and platinum-group metals in the United States. Our updated mine plan extends operations into the second half of 2030, supporting positive economic value and cash flow generation while we evaluate future ore opportunities.

Corporate video
Watch
Vrify Map
Start Tour
Projects

Vivamus malesuada ligula urna, ut laoreet mi convallis at. Pellentesque eu mi id urna

Eagle Mine
Eagle Mine

Michigan

Eagle Mine is an underground, high-grade nickel and copper mine located in western Marquette County in Michigan’s Upper Peninsula. The mine has been operating since 2014 and is recognized as the first mine permitted under Michigan’s Part 632 Non-Ferrous Mineral Mining Law. The mine accesses the orebody via a mile-long…
Humboldt Mill
Humboldt Mill

Near Champion, Michigan

Tamarack Project
Tamarack Project

Central Minnesota

The Tamarack Project is a high-grade nickel and copper development project located in central Minnesota. The project is being advanced by Talon Metals through a joint venture with Rio Tinto and represents an important part of Talon’s strategy to responsibly supply domestically sourced metals essential to U.S. manufacturing, energy, defense,…
Michigan
Michigan

Minnesota
Minnesota

TSX: TLO OTC: TLOFF

$8.90 (+0.22)

Day Hi 9.08
Vol 227,919

$6.28 (+0.18)

Day Hi 6.355
Vol 101,570
01 / 03
Sustainability

Committed to Responsible Operations

Talon operates to high environmental standards in Michigan's Upper Peninsula. Tailings are deposited subaqueously at the Humboldt Tailings Disposal Facility, delivered through double-containment pipelines with monitoring designed to protect water quality. Our closure planning includes reclamation to productive forest, long-term water treatment, and groundwater monitoring with financial assurance already in place under Michigan's regulatory framework.

Sustainability

Committed to Responsible Operations

Talon operates to high environmental standards in Michigan's Upper Peninsula. Tailings are deposited subaqueously at the Humboldt Tailings Disposal Facility, delivered through double-containment pipelines with monitoring designed to protect water quality. Our closure planning includes reclamation to productive forest, long-term water treatment, and groundwater monitoring with financial assurance already in place under Michigan's regulatory framework.

Sustainability

Committed to Responsible Operations

Talon operates to high environmental standards in Michigan's Upper Peninsula. Tailings are deposited subaqueously at the Humboldt Tailings Disposal Facility, delivered through double-containment pipelines with monitoring designed to protect water quality. Our closure planning includes reclamation to productive forest, long-term water treatment, and groundwater monitoring with financial assurance already in place under Michigan's regulatory framework.